Enginneer Dave Hein was commissioned by the Transportation Association of Canada to uncover better solutions to pothole repairs. (The Canadian Press)

Underfunding, bad repairs, cited for why Canadian roads are breaking down

Engineer calls potholes ‘very personal’ for those who have to pay for new rims, tires and more

Municipal and provincial governments in Canada are all looking for better ways to deal with their growing pothole problems, but none is properly tracking whether the repairs they do now are effective over time, says the author of a soon-to-be completed study on the roadway menaces.

And few appear prepared to spend the money necessary to ensure what they shovel into the car-crippling craters lasts until longer-term road repairs can be performed, says engineer Dave Hein.

READ MORE: Drivers swerve to avoid giant potholes on dangerous road near B.C. city

“Everybody says they’re trying new things,” says Hein, who calls potholes “very personal” for the countless drivers who have to pay for new wheel rims and tires and to fix bent suspensions after encountering them.

“Everybody’s looking for the magic bullet, and nobody’s got the magic bullet,” says Hein, principal engineer at Applied Research Associates, Inc., which was commissioned by the Transportation Association of Canada to uncover better solutions to pothole repairs. The association studies technical issues related to roads, highways and urban transportation.

“Nobody has performance measures,” Hein added in an interview with The Canadian Press. “And nobody even tracks to see if what they are doing is performing better than somebody else.”

Cities and towns, along with provincial and territorial governments, have been experimenting with different materials and new technologies to tackle potholes.

The cities of Ottawa and Thunder Bay, Ont., Cranbrook, B.C., and Montreal are among those that have experimented with a pothole-filling machine called the Python 5000, which mechanically fills cracks and crevices in roadways — work normally performed by manual labourers — in efforts to speed repairs and ensure they are done uniformly.

Others have tested a variety of hot and cold mixes of asphalt and other materials, hoping they find something better than what has been used in the past.

Hein’s final report to the association is due in April.

The Canadian Press

Like us on Facebook and follow us on Twitter

Just Posted

Five km run and walk raises funds for Stettler Hospice Society

Stettler District Ambulance Association encourages community to be active

Ol’ MacDonald’s Resort has a packed line-up of musical performances

Weekend country music festival set for Sept. 6th-8th

Alberta RCMP warns property owners of paving contractor scams

Travelling companies offer paving or roof sealing services typically to seniors in rural communities

Renegade Station is gearing up for a performance at ‘Entertainment in the Park’ on Aug. 28th

It’s been a hectic season in the successful Stettler-based band’s journey

VIDEO: Title of 25th Bond movie is ‘No Time to Die’

The film is set to be released in April 2020

RCMP and fire departments respond to possible drowning on Sylvan Lake

RCMP say they are actively searching for a man in his 20s with boats on the lake

New study suggests autism overdiagnosed: Canadian expert

Laurent Mottron: ‘Autistic people we test now are less and less different than typical people’

Trans Mountain gives contractors 30 days to get workers, supplies ready for pipeline

Crown corporation believes the expansion project could be in service by mid-2022

New ‘Matrix’ film set with Keanu Reeves and Lana Wachowski

Fourth installment to feature Reeves as Neo and Carrie-Anne Moss as Trinity

Ethics commissioner ready to testify on Trudeau, SNC-Lavalin: NDP critic

A new poll suggests the report hasn’t so far hurt the Liberals’ chances of re-election this fall

Inflation hits Bank of Canada 2% target for second straight month

Prices showed strength in other areas, including an 18.9 per cent increase in the cost of fresh vegetables

Alberta oil curtailment rules extended to late 2020 as pipeline delays drag on

At issue is ability to export oil in face of regulatory and legal challenges against pipelines

Most Read