Bashaw Concrete’s new ready mix plant is fully automated and gives the company a far more efficient way of measuring and loading concrete mix into its trucks.

Faster, more efficient: New concrete plant in Bashaw ‘ready’ to roll

New ready mix delivery project also helps boost local economy by using local contractors

The old expression “making hay while the sun shines” has a firm basis in reality, especially in farm country.

And when winter comes to central Alberta, getting much done outdoors becomes difficult, which is why the folks at Bashaw Concrete got busy earlier this year on their new automated concrete plant a block east of their existing plant.

Working on the project during the warmer months – it’s operational now, with a few last finishing touches required on the building – has allowed them to increase the efficiency of their ready mix concrete operations.

Getting your load to you quickly

When you order concrete for delivery for your own commercial, farm or residential project, you’ll even more precisely get what you pay for, and potentially more quickly, says Dorene Hay, Bashaw Concrete owner.

“This allows us to be a lot more precise with our batching, and with more efficiency and speed,” she says. “We were still using the portable batching plant my dad Mel put in in the 1970s, which was all manual, right down to the cement scale. We couldn’t load fast enough, but now with computer-controlled scales for the cement and water, we can now do a few extra loads in a day.” They’ve gone from taking about 10 minutes to load a full concrete mixer to under four minutes!

Truck storage also added

The ability to keep six mixer trucks warmer in winter, along with the ready-mix material, was another key part of the new plant, Dorene says. While the winter months see less outdoor projects that require concrete, the company remains poised to deliver ready mix for those and the many indoor projects on the go around central Alberta.

Family, staff part of construction crew

The company started by Mel Hay in 1963 has transformed with Dorene at the helm managing all day-to-day operations for over 20 years now. Sons Dylan and Dallas in key positions and being groomed to take over in the future with experienced help coming from long time employee and Uncle Ron King.

All of them played roles in building the new plant, as did other employees.

Ron did welding on the project, including on the ingenious natural gas-fired dry-steam system that keeps the rock and sand mixture from freezing; Dallas, a civil engineer, drew up plans for the plant and heavy-duty mechanic Dylan helped out on the mechanical side of things.

Keeping things local

Big fans of supporting the local and region economies, Bashaw Concrete chose to use local contractors and subcontractors to build the new plant – most are long-time valued customers, Dorene says – including the electrical and plumbing work. The main batching machinery is manufactured in Alberta, and much of the supplies and materials used were locally or regionally sourced.

*****

To inquire about the services and products available through Bashaw Concrete, call them at 780-372-3854 or visit them online at bashawconcrete.com. You can also keep up on the concrete news on their Facebook page.

 

Many yards of concrete were used to construct Bashaw Concrete’s new ready mix plant, just a block away from the original plant.

Comments are closed

Just Posted

Alberta RCMP caution citizens about signs of cybercrime

Police are reminding the public to be cautious while shopping online

Black Press Extreme Education and Career Fair coming to Red Deer College’s Cenovus Learning Commons

Central Albertans can connect with employers on Nov. 28 from 11 a.m. to 3 p.m.

WATCH: Stettler residents gather to observe Remembrance Day

Hundreds gather at the Stettler Performing Arts Centre to pay tribute

A flower, a poem, a campaign

Nowadays, Remembrance Day includes all wars that have occurred since the Great War.

Sandra Schmirler Foundation gives a $10,000 grant to Stettler Health Services Foundation

Funding will go to physiological monitors required for the two Panda warmers for the Labour and Delivery suites

‘We love you, Alex!’: Trebek gets choked up by ‘Jeopardy!’ contestant’s answer

The emotional moment came in Monday’s episode when Trebek read Dhruv Gaur’s final answer

Petition to ‘bring back Don Cherry’ goes viral after immigrant poppy rant

Cherry was fired from his co-hosting role for the Coach’s Corner segment on Nov. 11.

Imperial CEO says no to Aspen oilsands project until Alberta oil quotas gone

Imperial confirmed a plan to boost production from its Kearl oilsands mine

Three men charged after ‘targeted’ shooting, evacuation at Alberta mall

The accused, who range in age from 25 to 37, were arrested Sunday and remain in custody

VIDEO: Don Cherry says he was fired, not sorry for ‘Coach’s Corner’ poppy rant

Cherry denies he was singling out visible minorities with his comments

Disney Plus streaming service hits Canada with tech hurdles

Service costs $8.99 per month, or $89.99 per year, in Canada

Trudeau’s opponents: One gives him an earful, another seeks common ground

PM meets with Conservative leader Andrew Scheer and Saskatchewan Premier Scott Moe

Rona’s ‘truly Canadian’ ads are inaccurate, watchdog says

Ads Standards points out U.S.-based Lowe’s acquired Rona in 2016

Most Read